Meiktila Solar Power Station Project
Mandalay Region, Myanmar — Investment Application & Executive Project Overview
$22,000,000
(Govt. Approved 30MVA Benefit)30 MVA
Photovoltaic field output120 Acres
Out of 640 acres planned~ 1 Mile
Adjacent to main substation2,500+ hrs
Annual sunshine durationPreface
Energy is the core driving force for a country's economic development. As an important representative of clean and renewable energy, photovoltaic (PV) energy has become the core direction of global energy transition. In Myanmar, solar power generation projects have been listed as key national livelihood projects and a core part of the energy strategy. They not only shoulder the important mission of alleviating domestic power shortages and improving people's living electricity conditions, but also play a crucial role in promoting energy structure transformation, supporting green and sustainable development, and boosting regional economic upgrading.
Located in the tropical monsoon climate zone, Myanmar is endowed with abundant solar energy resources, with an average annual sunshine duration of 2,500–3,000 hours and an annual radiation dose exceeding 1,800 kWh/m² in some areas, which provides unique natural advantages for the development of the photovoltaic industry. In recent years, the Myanmar government has attached great importance to the development of the photovoltaic industry, continuously increased policy support and investment, and actively attracted domestic and foreign capital to participate in photovoltaic project construction through a series of measures such as simplifying project approval processes, improving power grid connection supporting facilities, and introducing investment preferential policies, accelerating the transformation process of photovoltaic projects from planning to implementation.
Against this background, the Meiktila Photovoltaic Power Station Project came into being. Relying on Meiktila's superior geographical location and improved power grid foundation, the project has multiple advantages such as moderate investment scale, clear cooperation model, stable and reliable returns, and strong policy guarantees. In the future, solar power generation will become an important pillar of Myanmar's national energy structure. Investing in Myanmar's photovoltaic industry is timely, and this project is an excellent investment option with great potential.
Core Project Overview
(1) Basic Project Information
This project is the construction project of Meiktila Photovoltaic Power Station, located in Meiktila City, Mandalay Region, Myanmar. It is adjacent to Meiktila Main Substation, with a distance of only 1 mile, which has unique power grid connection advantages and can greatly reduce power transmission losses and line construction costs.
The planned land area of the project is about 640 acres, among which the minimum installed capacity of the photovoltaic power plant for this investment application is 30MVA. To ensure the stable output of 30MVA power from the photovoltaic field, the project needs to reserve at least 120 acres of core construction land, and the remaining land can be used as reserve land for the subsequent expansion and upgrading of the project, reserving sufficient space for the long-term development of the project.
(2) Project Construction Objectives
After completion, the project will become an important clean energy supply base in the Meiktila region. On the one hand, it will effectively supplement the local power supply gap and alleviate the tension in regional industrial production and people's living electricity; on the other hand, it will promote the transformation of Myanmar's energy structure towards cleanliness and low carbon, help the country achieve green development goals, and at the same time create employment opportunities for the local area, drive the development of related industries.
Project Cooperation Model
This project adopts the "joint venture and co-construction" cooperation model. Myanmar GOLDEN FLAGMAST INTERNATIONAL Co., Ltd. (hereinafter referred to as "Myanmar Company") and the intended investor (hereinafter referred to as "Chinese Company") will jointly establish a joint venture company, which will serve as the main body to promote the whole-process operation of the project.
Specific operation process: After the establishment of the joint venture company, the Myanmar Company will take the lead in coordination to obtain the construction land for the photovoltaic plant (at least 120 acres) in the area designated by the Myanmar government and complete the relevant project approval procedures; subsequently, the joint venture company will formally apply to the relevant national departments of Myanmar for the construction qualification of a photovoltaic power plant with a scale of 30MVA and above. After approval, it will fully promote the investment, construction, operation and management of the project.
Foreign Investor
70%
Equity shareMyanmar Company
30%
Equity shareTo protect the legitimate rights and interests of both cooperating parties, the equity distribution is clearly defined: Myanmar GOLDEN FLAGMAST INTERNATIONAL Co., Ltd. holds 30% of the shares, and the foreign investor (International Company) holds 70% of the shares. Both parties shall enjoy project benefits, bear corresponding risks in accordance with the equity ratio, and jointly participate in major decisions of the joint venture company.
Division of Core Responsibilities
| Myanmar Company (30%) | International Company (70%) |
|---|---|
|
|
Project Cost Analysis
The cost structure of this project is clear, mainly covering land cost, power transmission line construction cost, project construction cost and operation and maintenance cost, with specific details as follows:
| Cost Category | Rate / Unit Cost | Details |
|---|---|---|
| Land Cost | 2M – 4M MMK / acre | Confirmed range after in-depth preliminary research and negotiation by the Myanmar Company. Based on the minimum 120 core acres, estimated land cost is 240M – 480M MMK. |
| Power Transmission Line Cost | 48M MMK / mile | Per the official calculation standard of the Myanmar government. As the site is only 1 mile from the substation, the estimated cost is 48M MMK. |
| Construction Cost | Calculated on scale | Covers PV modules, inverters, brackets, civil engineering, installation, and design/supervision, calculated by the investor per the actual investment scale (30 MVA and above); Myanmar Company assists with local price data. |
| Operation & Maintenance Cost | Ongoing, stable | Covers daily equipment maintenance, personnel salaries, water and electricity fees, taxes and fees; relatively stable and can be further controlled through refined management. |
Project Benefit Analysis
Economic Benefits
According to the official commitment of the Myanmar government, for the photovoltaic project with a scale of 30MVA, the approved expected benefit is 22 million US dollars. This benefit is the core benefit during the stable operation period of the project and has clear policy guarantees. In addition, after the project is put into operation, it can also enjoy the tax preferential policies of the Myanmar government for new energy projects (such as reduction or exemption of part of corporate income tax, import tariffs, etc.), further enhancing the project's profit space.
Social Benefits
Alleviating power shortage: After the project is completed, it can stably output clean power, effectively supplement the power supply in Meiktila and surrounding areas, ensure the needs of industrial production and people's living electricity, and promote regional economic development.
Promoting industrial upgrading: The project will introduce advanced photovoltaic technology and management experience, drive the development of related industries in Myanmar's local photovoltaic industry chain, and improve the technical level of the domestic new energy industry.
Core Project Guarantee Measures
This project has multiple authoritative guarantees, which can effectively reduce investment risks and ensure the smooth implementation and stable operation of the project:
Legal Guarantee
Relevant laws and regulations of Myanmar have clearly stipulated the protection of various legitimate rights of foreign investors, including property rights, income rights, transfer rights, etc., providing a solid legal basis for investors and ensuring investment safety.
Enterprise Qualification Guarantee
The Myanmar cooperating company (Myanmar GOLDEN FLAGMAST INTERNATIONAL Co., Ltd.) is an investment promotion enterprise designated by Myanmar's national ministries and commissions, with rich experience in government resource docking and project operation to ensure smooth project progress.
National Policy Incline
During the visit of Myanmar's national leaders to Meiktila on December 10, 2024, they clearly instructed to fully implement and promote the application and construction of solar energy projects, giving this project faster approval processes and more in-place policy support.
Power Grid Supporting Guarantee
The project site is adjacent to Meiktila Main Substation, with superior power grid connection conditions, removing the need for large-scale long-distance transmission lines and ensuring smooth power absorption from day one.
Market Prospect Outlook
As an emerging market in Southeast Asia, Myanmar's economy is in a stage of rapid development, and power demand is continuously rising. At present, Myanmar's power supply is still dominated by traditional energy, with a low proportion of new energy, so the photovoltaic industry has huge development space. With the acceleration of global energy transformation and the strong support of the Myanmar government for the new energy industry, photovoltaic projects will usher in unprecedented development opportunities.
As an important economic and transportation hub in Mandalay Region, Meiktila City has a solid industrial foundation, dense population and strong power demand, providing a stable market guarantee for the power absorption of this project. At the same time, the Myanmar government is actively promoting the construction of the new energy industry chain, and will further improve the supporting policies for the photovoltaic industry in the future, providing a good market environment for the long-term operation of the project.
Project Attachments & Maps
View full PDF →Government Invitation Notice
Ministry: Ministry of Electricity & Energy
Entity: Electric Power Generation Enterprise (EPGE)
Letter No.: 3327 / La Sa Tha La / Pa Sa Ra A / Sa-56 / 2026
Date: May 11, 2026
Meeting Date: May 12, 2026 (13:00 hrs)
Discussion Purpose:
Proposal review for 200-acre solar plant project near Sipinthar & Kyaukphyukone villages, 1 mile from Kankang Substation.
Substation Capacity Options
High-Level Directive
During the state visit to Meiktila on December 10, 2024, explicit national instructions were issued to fully accelerate solar energy project applications and construction.
Full Project Overview
The complete investment application document, in original layout.